Mabuhay Energy Corporation
By Mabuhay EnergyBlog5 min readMay 14, 2026

RCOA 100 kW in the Philippines: Who Qualifies and How to Check

RCOA 100kW: Ano ang Kailangang Malaman ng mga Negosyo sa Pilipinas Tungkol sa Pagpili ng Supplier ng Kuryente

The Philippines' 100 kW RCOA threshold took effect June 26, 2026. Learn who qualifies, how to check electricity demand, and what to do next.

Table of Contents▾

The Philippines' RCOA eligibility threshold fell to 100 kW of average monthly peak demand on June 26, 2026. This guide explains how businesses can check their electricity demand, what the 12-month requirement means, and the next steps if they appear eligible.

What is RCOA?

Retail Competition and Open Access (RCOA) lets eligible electricity customers in the Philippines choose a licensed Retail Electricity Supplier (RES) for the supply component of their electricity service. The distribution utility continues operating the physical distribution network. Choosing a supplier still involves eligibility checks, registration, metering and contractual requirements.

The 100 kW threshold: what changed

On June 26, 2026, the Energy Regulatory Commission's lower contestability threshold took effect, reducing the minimum demand level from 500 kW to 100 kW. This opened supplier choice to more medium-sized establishments and other qualifying electricity users. The threshold relates to demand in kilowatts (kW), not total electricity consumed in kilowatt-hours (kWh).

Source: ERC threshold announcement; IEMOP switching bulletin.

Who qualifies for the 100 kW threshold?

For existing customers, eligibility generally considers average monthly peak demand of at least 100 kW over the preceding 12 months. New customers may be assessed using a forecast of monthly peak demand for the coming 12 months, subject to applicable verification. Reaching 100 kW on one bill alone does not establish that the 12-month average qualifies. Confirm your situation with the distribution utility, retail supplier and applicable market registration requirements.

How to check your electricity demand

  1. Gather your latest 12 electricity bills or demand records.
  2. Find the peak demand in kW for each month. Do not confuse this with energy consumption in kWh.
  3. Add the 12 monthly peak demand readings and divide by 12.
  4. If the average is at least 100 kW, ask for a formal eligibility check before proceeding with a retail supply agreement.

Illustrative example (not an actual customer): If the 12 monthly peak demand readings total 1,236 kW, the average is 1,236 / 12 = 103 kW. This clears the numerical demand threshold in the example, but actual eligibility and switching requirements still need confirmation.

For a newly opened facility: Ask how a 12-month demand forecast should be prepared and validated instead of assuming that 12 months of historical bills are required in every case.

If the demand data is not clearly shown on your bill, request a business electricity assessment.

What if your site is below 100 kW? Understanding RAP

The Retail Aggregation Program (RAP) may allow smaller end-users or sites to combine demand and participate as an eligible group. Aggregation is not automatic: the group must satisfy the applicable regulatory, location, registration and switching requirements. The ERC also issued transition clarifications for existing aggregation applications after the new threshold took effect. Ask the relevant parties to confirm whether your sites can join the same eligible group before relying on a combined figure.

Source: ERC's RAP clarification, June 29, 2026.

What to expect if your business appears eligible

Eligibility checking is only the first step. Before switching, review potential supply offers and contract terms, then coordinate the required Letter of Intent, registration and metering arrangements with the relevant parties. The actual schedule depends on documentation, network service provider and metering readiness. Changing the retail supplier normally does not mean replacing the distribution network serving your facility; any meter work or planned service interruption should be confirmed in advance rather than guaranteed away.

See how switching works.

Why eligibility matters for your business

RCOA gives eligible customers an opportunity to compare electricity supply arrangements. Existing distribution utility bills already include regulated charge components, so the decision is not simply about obtaining a bill breakdown. Evaluate the proposed supply price and adjustment mechanisms, pass-through costs, contract duration, termination terms, billing clarity and account support. Savings or operational benefits depend on your load profile and the offer you accept; they are not automatic.

Explore retail electricity supplier options.

Sources and further reading

Frequently Asked Questions

What does RCOA 100 kW mean?▾
The 100 kW threshold is the average monthly peak electricity demand level used for eligibility under the expanded retail electricity market, effective June 26, 2026. Eligible customers may choose a licensed retail electricity supplier, subject to the other applicable requirements.
How do I calculate the 100 kW demand threshold?▾
For an existing customer, add the monthly peak demand readings in kW from the preceding 12 months and divide by 12. A result of at least 100 kW meets the numerical threshold; eligibility and switching requirements must still be confirmed.
What if my facility does not have 12 months of electricity bills?▾
New customers may be assessed using a forecast of monthly peak demand over the next 12 months. Ask your distribution utility or retail supplier what forecast records and verification are required for your facility.
Can businesses below 100 kW qualify through aggregation?▾
Possibly. The Retail Aggregation Program allows eligible groups to combine electricity demand, but the applicable grouping, location and registration rules must be checked. Individual sites should not assume aggregation is automatic.
Will changing my retail electricity supplier interrupt power?▾
Supplier switching generally retains the same distribution network. However, any metering work or planned service changes should be checked with the distribution utility and retail metering service provider; a disruption-free process should not be promised without a site-specific review.
Do I need a new meter to switch?▾
Metering requirements depend on the existing installation and the applicable retail market standards. The relevant metering service provider can confirm whether an upgrade or adjustment is needed before switching.

Could your business benefit from open access?

Businesses consuming 100 kW or more have the right to choose their electricity supplier under RCOA.

Get a free assessment →